Concrete mixing
Your current location: 首 页 > Hot push information

Guangyuan professional batching machine use

2022-09-28
Guangyuan professional batching machine use

In the concrete production process,专业Batching machine用途Equipment cleaning and vehicle cleaning process will produce a lot of sewage wastewater。At the same time, direct emissions will also cause great harm to the environment。Therefore, the sewage transformation treatment system in concrete production will realize 100% recovery of its wastewater and achieve zero sewage discharge standards。Sewage treatment and renovation system mainly includes concrete transport team discharge chute, sand separator equipment, sewage settling tank, sewage tank agitator, clarification tank, transport pump, filter press, etc。The conventional system has a total of four sump tanks and three clarifier tanks。Each of the 4 sump ponds has a surface guardrail and agitator。And No. 1 pool, No. 2 pool, No. 3 sewage pool is equipped with mud type pump, No. 2 and No. 4 pool is designed with liquid level meter;3 clarifier tanks You each have a sewage type pump。The periodic uniform movement of the agitator in the tank ensures that the water quality in the tank is uniform。The various pools in the sewage treatment system need to be arranged in a certain order, and the overflow pipes are connected to each other at the lower part of the pool, and the pumps are connected to each other at the upper part。When the amount of water in the pool is insufficient, the pump can be used to transport water to maintain the stability of the water。If there is a lot of water in the pool, it will flow back through the overflow pipe provided in the pool, and the water quality will be clarified during the reflux process。In the concrete mixing station, there is a flow tank connected with the sewage tank to collect rainwater into the pool to ensure the cleanliness of the station and reduce the operating cost。The main station and the vehicle cleaning system are equipped with a special flow tank to divert the production sewage to the sewage tank for unified treatment。Through the guided transformation of the entire drainage in the concrete mixing station, the sewage in the mixing station is not drained, and the treated sewage is directly supplied to the mixing station for use and vehicle cleaning use after inspection.Batching machine用途The resulting slag can also be used as an added aggregate。Achieve zero discharge of sewage treatment。

Guangyuan professional batching machine use

1.Performance label of construction concrete;专业Batching machineFrom this to choose what kind of mixing machine。Such as water conservancy projects must choose a forced mixing host。In addition, the batching station and storage bin should be selected according to the types of concrete materials that can be mixed。2.The task quantity and duration of concrete construction;Use these two parameters to choose how big the mixing plant is。The total task quantity of concrete is set as M;The number of days for concrete pouring is T;The working hours per day are H;If the utilization factor is K, the specification of the mixing plant X=M/(T*H*K) should be selected, where K is 0.7-0.9。The transportation condition of finished concrete should also be considered in the selection。Such as: direct pumping or vehicle delivery。The volume of the conveying vehicle is also an important basis for determining the type of mixing station。3.Construction environment and construction object;When choosing to purchase a concrete mixing plant, the impact of the construction object and the construction environment should be fully considered, so as to ensure the smooth construction and construction quality。In the following cases, we recommend that you be prepared。4.When the site needs to pour a large amount of one-time, high quality requirements, and there is no nearby reinforcement of the mixing plant, choose two smaller specifications of the mixing plant, or choose a master a pair of dual machine preparation。5.When the site traffic is inconvenient and maintenance personnel need to spend a lot of time entering and leaving the site, choose to use the same smaller specifications of the dual machine station, or prepare enough spare parts, so as to ensure the smooth construction progress。6.When the construction site is more dispersed, but the distance between the sites is not too far, the transport radius of the concrete mixing truck is not more than half an hour by car, and the transport of the dump truck is not more than 10 minutes by car。The use of multi-number centralized mixing to improve the utilization rate of mixing plant and construction economic benefits。7.The quality of operators;Generally speaking, the structure of the small mixing plant is simple, and the control system is also simple, so the requirements for operation and maintenance personnel are low。The larger station structure is complex and the degree of automation is high, so the requirements for operators are also high。Therefore, in addition to the previous factors, you should also consider this factor when purchasing a mixing plant。8.Preparation selection;Under normal circumstances, the manufacturer has a mature product preparation, such as specifications, quantities, varieties, etc。You can make your special request when ordering the product。We will do our best to meet your requirements。However, in the purchase of products should not be greedy, which will cause economic waste。In addition to referring to the prices of different manufacturers when purchasing products, special attention should be paid to the preparation lists of different manufacturers。Batching machine用途In addition to the above specifications, varieties and quantities, the most important thing is the manufacturer of the parts。In summary, you can always choose the most suitable model for you。In the choice of models do not pursue the good, but should pursue the most suitable and meet your needs, because such a choice is the most economic and most effective。

Guangyuan professional batching machine use

Mixing station control system is equipped with accurate batching machine equipment,广元专业Batching machineSeveral independent ingredient lines can be controlled at the same time, and each ingredient line can be set according to user requirements。Control system in addition to sensors,Batching machine用途All placement away from the site mixing plant central control room for centralized operation control, the system design has reached the expected goal。Mixing plant control system equipment functions have the following benefits: mixing plant control system ▪ high degree of automation ▪ Operation automation ▪ Simple operation ▪ high safety factor ▪ Easy maintenance

Guangyuan professional batching machine use

Operation rules for concrete double horizontal shaft forced mixer 1.专业Batching machine用途Before use, check the power supply first press the switch, and then close the tool brake to check whether the operation is flexible。Whether the vibrator, drum and rod operate normally。The winding of the wire rope on the drum;Whether the lifting of the discharge platform is normal。If the fault is found, notify the mechanical and electrical team to deal with it。After handling, you can use it。2, a feeding should not be too much, according to the ratio of feeding, pay attention to the water cement ratio。Stir well, a stirring time should not be less than one minute, the normal mix of concrete, should be very thick porridge。3, fixed special boot, the driver should be familiar with the operating system principle, found fault immediately stop the check。4、专业Batching machine用途Electrical parts should be taken care of and cables should be protected to prevent damage。5, the mixer should be flat, the mixer should not stand under the funnel, to prevent injury when the funnel falls。6. When temporarily stopping the rail, the mixer should be started regularly (every 20 minutes) to prevent the concrete from solidifying or pouring out the concrete in the roller, and wash the roller with water。7. After the concrete is poured and shut down, the mortar outside the roller and machine should be washed with water in time。The feed hopper is cleaned once per shift, so that the feed material falls to the position specified by the party when it is placed, and a layer of oil is applied on the surface for next use。8. Conscientiously implement the shift transfer system, and explain the operation of the working machine and matters needing attention clearly.

Guangyuan professional batching machine use

Performance label of construction concrete;From this to choose what kind of mixing machine。Such as water conservancy projects must choose a forced mixing host。In addition, the batching station and storage bin should be selected according to the types of concrete materials that can be mixed。The task quantity and duration of concrete construction;Use these two parameters to choose how big the mixing plant is。The total task quantity of concrete is set as M;The number of days for concrete pouring is T;The working hours per day are H;If the utilization factor is K, the specification of the mixing plant X=M/(T*H*K) should be selected, where K is 0.7-0.9。The transportation condition of finished concrete should also be considered in the selection。Such as: direct pumping or vehicle delivery。The volume of the conveying vehicle is also an important basis for determining the type of mixing station。Construction environment and construction object;When choosing to purchase a concrete mixing plant, the impact of the construction object and the construction environment should be fully considered, so as to ensure the smooth construction and construction quality。In the following cases, we recommend that you be prepared。When the site needs a large amount of one-time pouring,专业Batching machine用途When the quality requirements are high, and there is no nearby mixing station that can be reinforced, it is best to choose two mixing stations with smaller specifications, or choose a dual machine configuration of a master and a pair。When the site traffic is inconvenient and maintenance personnel need to spend a lot of time in and out of the site, it is best to choose a dual station with the same smaller specifications, or prepare enough spare parts to ensure the smooth construction progress。When the construction site is more dispersed, but the distance between the sites is not too far, the transport radius of the concrete mixing truck is not more than half an hour by car, and the transport of the dump truck is not more than 10 minutes by car。It is best to use multi-worker centralized mixing to improve the utilization rate and construction economic benefits of the mixing station。The quality of operators;Generally speaking, the structure of the small mixing plant is simple, and the control system is also simple, so the requirements for operation and maintenance personnel are low。The larger station structure is complex and the degree of automation is high, so the requirements for operators are also high。Therefore, in addition to the previous factors, you should also consider this factor when purchasing a mixing plant。Batching machine用途Preparation selection;Under normal circumstances, the manufacturer has a mature product preparation, such as specifications, quantities, varieties, etc。You can make your special request when ordering the product。We will do our best to meet your requirements。However, in the purchase of products should not be greedy, which will cause economic waste。In addition to referring to the prices of different manufacturers when purchasing products, special attention should be paid to the preparation lists of different manufacturers。In addition to the above specifications, varieties and quantities, the most important thing is the manufacturer of the parts。In summary, you can always choose the most suitable model for you。When choosing a model, do not pursue the best, but should pursue the most suitable and meet your needs, because such a choice is the most economical and most effective。

标签